Week 10: Wrist SPM Proof of Concept & Elbow V2
Week of November 16-20
This week wrapped up phase four (simulation/prototype) of our project plan. We developed a new proof of concept for the wrist, started V2 of our combined elbow and wrist, and continued work on the shoulder, simulation, and electrical system.
Wrist spherical parallel mechanism
Building on published research, we developed a proof of concept for a spherical parallel mechanism (SPM) for the wrist, which drives flexion/extension and radial/ulnar deviation through three rotating rings around the wrist. To check the design, we built an interactive 3D viewer that compares the mechanism's reach against the full human wrist range and flags poses where parts would collide with each other or the arm. The team then worked together to print and assemble the mechanism to test it.
Elbow, shoulder, and simulation
We started V2, which will combine the wrist SPM with improved elbow mounting and fastening into a single system, while still exploring a flexible tessellation cuff. We also designed a hand mount for wrist prototyping. For the shoulder, we moved from last week's research and sketches to designing and printing the scissor linkage, and we connected our MuJoCo simulation to the elbow prototype so the simulated humanoid's elbow follows the operator's arm.
Electrical and power
We continued developing our electrical schematic and began researching CSA compliance for our power system, which we will need to safely demo the exoskeleton at symposium.
Current status
- Phase four (simulation/prototype) wrapped up
- Wrist SPM proof of concept designed, printed, and assembled, with a 3D viewer to check its range
- V2 combined elbow and wrist system started, and MuJoCo simulation connected to the elbow prototype
- Shoulder scissor linkage being designed and printed, and CSA compliance research ongoing
Personal contributions
| Team member | Personal contribution |
|---|---|
| Vishesh Garg | Developed the initial proof of concept for the wrist SPM mechanism and its 3D motion viewer. |
| Connor Switzer | Continued the electrical schematic and began researching CSA compliance for our power system. |
| Celine Ebrahimian | Continued designing and printing the shoulder scissor linkage, and connected the MuJoCo simulation to our elbow prototype. |
| Callista Tan | Assisted with the electrical schematic and with designing and printing the shoulder scissor linkage. |
| Laila Elhossini | Designed a hand mount for wrist prototyping and started V2 development. |